The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned

After 4 years of activity, the assembly of approximately 500 Short Straight Sections (SSS) for the LHC has come to an end at the beginning of 2007. This activity, which was initially foreseen in European industry, was in-sourced at CERN because of the insolvency of the prime contractor. While the qu...

Descripción completa

Detalles Bibliográficos
Autores principales: Bourcey, N, Campos, P, López, R, Poncet, A, Parma, V
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1099106
_version_ 1780913962982834176
author Bourcey, N
Campos, P
López, R
Poncet, A
Parma, V
author_facet Bourcey, N
Campos, P
López, R
Poncet, A
Parma, V
author_sort Bourcey, N
collection CERN
description After 4 years of activity, the assembly of approximately 500 Short Straight Sections (SSS) for the LHC has come to an end at the beginning of 2007. This activity, which was initially foreseen in European industry, was in-sourced at CERN because of the insolvency of the prime contractor. While the quadrupole cold masses were produced in industry, the assembly within their cryostats was transferred to CERN and executed by an external company under a result-oriented contract. CERN procured cryostat components, set up a dedicated 2000 m2 assembly hall with all the specific assembly equipment and tooling and defined the assembly and testing procedures. The contractor took up responsibility for the delivery, on time, of assemblies according to the required quality. A dedicated CERN production and quality assurance team was constituted. A specific quality assurance plan was set up involving 2 additional contractors responsible for weld inspections on a total of about 20'000 assembly welds and the execution of about 3300 leak detection tests. This paper presents the organizational aspects of the activity and the experience gained throughout the production. The learning curves and statistics by type of non-conformities detected and general quality assurance aspects are presented and discussed. The main lessons learnt are summarized, in an attempt to draw some conclusions which could be useful in making strategic choices for the cryostat assembly in future large-scale accelerators.
id cern-1099106
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10991062023-05-31T13:24:34Zhttp://cds.cern.ch/record/1099106engBourcey, NCampos, PLópez, RPoncet, AParma, VThe Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons LearnedAccelerators and Storage RingsAfter 4 years of activity, the assembly of approximately 500 Short Straight Sections (SSS) for the LHC has come to an end at the beginning of 2007. This activity, which was initially foreseen in European industry, was in-sourced at CERN because of the insolvency of the prime contractor. While the quadrupole cold masses were produced in industry, the assembly within their cryostats was transferred to CERN and executed by an external company under a result-oriented contract. CERN procured cryostat components, set up a dedicated 2000 m2 assembly hall with all the specific assembly equipment and tooling and defined the assembly and testing procedures. The contractor took up responsibility for the delivery, on time, of assemblies according to the required quality. A dedicated CERN production and quality assurance team was constituted. A specific quality assurance plan was set up involving 2 additional contractors responsible for weld inspections on a total of about 20'000 assembly welds and the execution of about 3300 leak detection tests. This paper presents the organizational aspects of the activity and the experience gained throughout the production. The learning curves and statistics by type of non-conformities detected and general quality assurance aspects are presented and discussed. The main lessons learnt are summarized, in an attempt to draw some conclusions which could be useful in making strategic choices for the cryostat assembly in future large-scale accelerators.LHC-PROJECT-Report-1074CERN-LHC-PROJECT-Report-1074oai:cds.cern.ch:10991062007
spellingShingle Accelerators and Storage Rings
Bourcey, N
Campos, P
López, R
Poncet, A
Parma, V
The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title_full The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title_fullStr The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title_full_unstemmed The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title_short The Assembly of the LHC Short Straight Sections at CERN: Work Organization, Quality Assurance and Lessons Learned
title_sort assembly of the lhc short straight sections at cern: work organization, quality assurance and lessons learned
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1099106
work_keys_str_mv AT bourceyn theassemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT camposp theassemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT lopezr theassemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT ponceta theassemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT parmav theassemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT bourceyn assemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT camposp assemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT lopezr assemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT ponceta assemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned
AT parmav assemblyofthelhcshortstraightsectionsatcernworkorganizationqualityassuranceandlessonslearned