Cargando…
Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector
The cryogenic system [1] for the Large Hadron Collider accelerator is presently in its final phase of commissioning at nominal operating conditions. The refrigeration capacity for the LHC is produced using eight large cryogenic plants and eight 1.8 K refrigeration units installed on five cryogenic i...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.2908501 http://cds.cern.ch/record/1099113 |
_version_ | 1780913964278874112 |
---|---|
author | Serio, L Bouillot, A Casas-Cubillos, J Chakravarty, A Claudet, S Gicquel, F Gomes, P Kumar, M Kush, PK Millet, F Perin, A Rabehl, R Singh, MR Soubiran, M Tavian, L |
author_facet | Serio, L Bouillot, A Casas-Cubillos, J Chakravarty, A Claudet, S Gicquel, F Gomes, P Kumar, M Kush, PK Millet, F Perin, A Rabehl, R Singh, MR Soubiran, M Tavian, L |
author_sort | Serio, L |
collection | CERN |
description | The cryogenic system [1] for the Large Hadron Collider accelerator is presently in its final phase of commissioning at nominal operating conditions. The refrigeration capacity for the LHC is produced using eight large cryogenic plants and eight 1.8 K refrigeration units installed on five cryogenic islands. Machine cryogenic equipment is installed in a 26.7-km circumference ring deep underground tunnel and are maintained at their nominal operating conditions via a distribution system consisting of transfer lines, cold interconnection boxes at each cryogenic island and a cryogenic distribution line. The functional analysis of the whole system during all operating conditions was established and validated during the first sector commissioning in order to maximize the system availability. Analysis, operating modes, main failure scenarios, results and performance of the cryogenic system are presented. |
id | cern-1099113 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10991132023-05-31T13:23:23Zdoi:10.1063/1.2908501http://cds.cern.ch/record/1099113engSerio, LBouillot, ACasas-Cubillos, JChakravarty, AClaudet, SGicquel, FGomes, PKumar, MKush, PKMillet, FPerin, ARabehl, RSingh, MRSoubiran, MTavian, LValidation and Performance of the LHC Cryogenic System through Commissioning of the First SectorAccelerators and Storage RingsThe cryogenic system [1] for the Large Hadron Collider accelerator is presently in its final phase of commissioning at nominal operating conditions. The refrigeration capacity for the LHC is produced using eight large cryogenic plants and eight 1.8 K refrigeration units installed on five cryogenic islands. Machine cryogenic equipment is installed in a 26.7-km circumference ring deep underground tunnel and are maintained at their nominal operating conditions via a distribution system consisting of transfer lines, cold interconnection boxes at each cryogenic island and a cryogenic distribution line. The functional analysis of the whole system during all operating conditions was established and validated during the first sector commissioning in order to maximize the system availability. Analysis, operating modes, main failure scenarios, results and performance of the cryogenic system are presented.LHC-PROJECT-Report-1080CERN-LHC-PROJECT-Report-1080oai:cds.cern.ch:10991132007-12-10 |
spellingShingle | Accelerators and Storage Rings Serio, L Bouillot, A Casas-Cubillos, J Chakravarty, A Claudet, S Gicquel, F Gomes, P Kumar, M Kush, PK Millet, F Perin, A Rabehl, R Singh, MR Soubiran, M Tavian, L Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title | Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title_full | Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title_fullStr | Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title_full_unstemmed | Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title_short | Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector |
title_sort | validation and performance of the lhc cryogenic system through commissioning of the first sector |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1063/1.2908501 http://cds.cern.ch/record/1099113 |
work_keys_str_mv | AT seriol validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT bouillota validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT casascubillosj validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT chakravartya validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT claudets validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT gicquelf validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT gomesp validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT kumarm validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT kushpk validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT milletf validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT perina validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT rabehlr validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT singhmr validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT soubiranm validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector AT tavianl validationandperformanceofthelhccryogenicsystemthroughcommissioningofthefirstsector |