Commissioning of the I-LHC RF low level with beam
During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was u...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1100009 |
Sumario: | During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was used for several non RF related machine developments. |
---|