Commissioning of the I-LHC RF low level with beam
During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was u...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1100009 |
_version_ | 1780914008568627200 |
---|---|
author | Baudrenghien, P Bohl, T Wehrle, U |
author_facet | Baudrenghien, P Bohl, T Wehrle, U |
author_sort | Baudrenghien, P |
collection | CERN |
description | During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was used for several non RF related machine developments. |
id | cern-1100009 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11000092019-09-30T06:29:59Zhttp://cds.cern.ch/record/1100009engBaudrenghien, PBohl, TWehrle, UCommissioning of the I-LHC RF low level with beamAccelerators and Storage RingsDuring the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was used for several non RF related machine developments.CERN-AB-Note-2008-023oai:cds.cern.ch:11000092008-04-10 |
spellingShingle | Accelerators and Storage Rings Baudrenghien, P Bohl, T Wehrle, U Commissioning of the I-LHC RF low level with beam |
title | Commissioning of the I-LHC RF low level with beam |
title_full | Commissioning of the I-LHC RF low level with beam |
title_fullStr | Commissioning of the I-LHC RF low level with beam |
title_full_unstemmed | Commissioning of the I-LHC RF low level with beam |
title_short | Commissioning of the I-LHC RF low level with beam |
title_sort | commissioning of the i-lhc rf low level with beam |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1100009 |
work_keys_str_mv | AT baudrenghienp commissioningoftheilhcrflowlevelwithbeam AT bohlt commissioningoftheilhcrflowlevelwithbeam AT wehrleu commissioningoftheilhcrflowlevelwithbeam |