Cargando…
Commissioning of the I-LHC RF low level with beam
During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was u...
Autores principales: | Baudrenghien, P, Bohl, T, Wehrle, U |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1100009 |
Ejemplares similares
-
RF Studies of LHC Beams in the SPS
por: Baudrenghien, P, et al.
Publicado: (2003) -
First Beam Commissioning of the 400 MHz LHC RF System
por: Butterworth, A C, et al.
Publicado: (2009) -
Hardware and Initial Beam Commissioning of the LHC RF Systems
por: Linnecar, T, et al.
Publicado: (2008) -
SPS Beams for LHC: RF Beam Control to Minimize Rephasing in the SPS
por: Baudrenghien, P, et al.
Publicado: (1998) -
The LHC Low Level RF
por: Baudrenghien, Philippe, et al.
Publicado: (2006)