Cargando…

Commissioning of the I-LHC RF low level with beam

During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was u...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Bohl, T, Wehrle, U
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1100009

Ejemplares similares