Commissioning of the CMS Magnet

CMS (Compact Muon Solenoid) is one of the large experiments for the LHC at CERN. The superconducting magnet for CMS has been designed to reach a 4 T field in a free bore of 6 m diameter and 12.5 m length with a stored energy of 2.6 GJ at full current. The flux is returned through a 10 000 t yoke com...

Descripción completa

Detalles Bibliográficos
Autores principales: Campi, D, Curé, B, Gaddi, A, Gerwig, H, Hervé, A, Klyukhin, V, Maire, G, Perinic, G, Brédy, P, Fazilleau, P, Kircher, F, Levésy, B, Fabbricatore, P, Farinon, S, Greco, M
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2007.897754
http://cds.cern.ch/record/1102022
_version_ 1780914050877620224
author Campi, D
Curé, B
Gaddi, A
Gerwig, H
Hervé, A
Klyukhin, V
Maire, G
Perinic, G
Brédy, P
Fazilleau, P
Kircher, F
Levésy, B
Fabbricatore, P
Farinon, S
Greco, M
author_facet Campi, D
Curé, B
Gaddi, A
Gerwig, H
Hervé, A
Klyukhin, V
Maire, G
Perinic, G
Brédy, P
Fazilleau, P
Kircher, F
Levésy, B
Fabbricatore, P
Farinon, S
Greco, M
author_sort Campi, D
collection CERN
description CMS (Compact Muon Solenoid) is one of the large experiments for the LHC at CERN. The superconducting magnet for CMS has been designed to reach a 4 T field in a free bore of 6 m diameter and 12.5 m length with a stored energy of 2.6 GJ at full current. The flux is returned through a 10 000 t yoke comprising of five wheels and two end caps composed of three disks each. The magnet was designed to be assembled and tested in a surface hall, prior to be lowered at 90 m below ground, to its final position in the experimental cavern. The distinctive feature of the cold mass is the four-layer winding, made from a reinforced and stabilized NbTi conductor. The design and construction was carried out by CMS participating institutes through technical and contractual endeavors. Among them CEA Saclay, INFN Genova, ETH Zurich, Fermilab, ITEP Moscow, University of Wisconsin and CERN. The construction of the CMS Magnet, and of the coil in particular, has been completed last year. The magnet has just been powered to full field achieving electrical commissioning. After a brief reminder of the design and construction the first results of the commissioning are reported in this paper.
id cern-1102022
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-11020222019-09-30T06:29:59Zdoi:10.1109/TASC.2007.897754http://cds.cern.ch/record/1102022engCampi, DCuré, BGaddi, AGerwig, HHervé, AKlyukhin, VMaire, GPerinic, GBrédy, PFazilleau, PKircher, FLevésy, BFabbricatore, PFarinon, SGreco, MCommissioning of the CMS MagnetDetectors and Experimental TechniquesCMS (Compact Muon Solenoid) is one of the large experiments for the LHC at CERN. The superconducting magnet for CMS has been designed to reach a 4 T field in a free bore of 6 m diameter and 12.5 m length with a stored energy of 2.6 GJ at full current. The flux is returned through a 10 000 t yoke comprising of five wheels and two end caps composed of three disks each. The magnet was designed to be assembled and tested in a surface hall, prior to be lowered at 90 m below ground, to its final position in the experimental cavern. The distinctive feature of the cold mass is the four-layer winding, made from a reinforced and stabilized NbTi conductor. The design and construction was carried out by CMS participating institutes through technical and contractual endeavors. Among them CEA Saclay, INFN Genova, ETH Zurich, Fermilab, ITEP Moscow, University of Wisconsin and CERN. The construction of the CMS Magnet, and of the coil in particular, has been completed last year. The magnet has just been powered to full field achieving electrical commissioning. After a brief reminder of the design and construction the first results of the commissioning are reported in this paper.oai:cds.cern.ch:11020222007
spellingShingle Detectors and Experimental Techniques
Campi, D
Curé, B
Gaddi, A
Gerwig, H
Hervé, A
Klyukhin, V
Maire, G
Perinic, G
Brédy, P
Fazilleau, P
Kircher, F
Levésy, B
Fabbricatore, P
Farinon, S
Greco, M
Commissioning of the CMS Magnet
title Commissioning of the CMS Magnet
title_full Commissioning of the CMS Magnet
title_fullStr Commissioning of the CMS Magnet
title_full_unstemmed Commissioning of the CMS Magnet
title_short Commissioning of the CMS Magnet
title_sort commissioning of the cms magnet
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1109/TASC.2007.897754
http://cds.cern.ch/record/1102022
work_keys_str_mv AT campid commissioningofthecmsmagnet
AT cureb commissioningofthecmsmagnet
AT gaddia commissioningofthecmsmagnet
AT gerwigh commissioningofthecmsmagnet
AT hervea commissioningofthecmsmagnet
AT klyukhinv commissioningofthecmsmagnet
AT maireg commissioningofthecmsmagnet
AT perinicg commissioningofthecmsmagnet
AT bredyp commissioningofthecmsmagnet
AT fazilleaup commissioningofthecmsmagnet
AT kircherf commissioningofthecmsmagnet
AT levesyb commissioningofthecmsmagnet
AT fabbricatorep commissioningofthecmsmagnet
AT farinons commissioningofthecmsmagnet
AT grecom commissioningofthecmsmagnet