Cargando…

Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver

Feasibility studies of the accumulator and the compressor rings for the SPL based proton driver have been studied for a future neutrino factory. The scenario retained for the SPL proton driver uses six bunches, with 10^14 protons in total at 50 Hz. Possible lattices for the accumulator and the compr...

Descripción completa

Detalles Bibliográficos
Autor principal: Aiba, M
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1109981
_version_ 1780914270854184960
author Aiba, M
author_facet Aiba, M
author_sort Aiba, M
collection CERN
description Feasibility studies of the accumulator and the compressor rings for the SPL based proton driver have been studied for a future neutrino factory. The scenario retained for the SPL proton driver uses six bunches, with 10^14 protons in total at 50 Hz. Possible lattices for the accumulator and the compressor are presented. The beam injection/accumulation and the bunch compression are delicate issues and discussed in detail in this note. Throughout the presented study, these difficulties are disclosed not to be critical issues, and together with a discussion on the focusing towards production target, the feasibility of the 6-bunches SPL based proton driver has been confirmed
id cern-1109981
institution Organización Europea para la Investigación Nuclear
publishDate 2008
record_format invenio
spelling cern-11099812019-09-30T06:29:59Zhttp://cds.cern.ch/record/1109981Aiba, MFeasibility study of accumulator and compressor for the 6-bunches SPL based proton driverAccelerators and Storage RingsFeasibility studies of the accumulator and the compressor rings for the SPL based proton driver have been studied for a future neutrino factory. The scenario retained for the SPL proton driver uses six bunches, with 10^14 protons in total at 50 Hz. Possible lattices for the accumulator and the compressor are presented. The beam injection/accumulation and the bunch compression are delicate issues and discussed in detail in this note. Throughout the presented study, these difficulties are disclosed not to be critical issues, and together with a discussion on the focusing towards production target, the feasibility of the 6-bunches SPL based proton driver has been confirmedoai:cds.cern.ch:11099812008-06-11
spellingShingle Accelerators and Storage Rings
Aiba, M
Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title_full Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title_fullStr Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title_full_unstemmed Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title_short Feasibility study of accumulator and compressor for the 6-bunches SPL based proton driver
title_sort feasibility study of accumulator and compressor for the 6-bunches spl based proton driver
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1109981
work_keys_str_mv AT aibam feasibilitystudyofaccumulatorandcompressorforthe6bunchessplbasedprotondriver