Cargando…
Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
At the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer l...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1118253 |
_version_ | 1780914464652001280 |
---|---|
author | Bellodi, G Eshraqi, M Lallement, J B Lombardi, A M |
author_facet | Bellodi, G Eshraqi, M Lallement, J B Lombardi, A M |
author_sort | Bellodi, G |
collection | CERN |
description | At the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer line layout, as was described in the document ABâNoteâ2007â037. For radiological safety reasons the distance between the planned SPL tunnel and the basement of building 513 had to be increased, and this led to the decision to lower the Linac4 machine by 2.5m. A vertical ramp was consequently introduced in the transfer line to raise the beam at the same level of LINAC2/PSB for connection to the existing transfer line. A series of error study runs has been carried out on the modified layout to have an estimate of the losses induced by quadrupole alignment and field errors. The two worst cases of each error family have been used as case studies to test the efficiency of possible steering strategies in minimizing beam losses and machine activation. The new layout and beam dynamics issues plus the results of the error and steering studies are discussed in this note. |
id | cern-1118253 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11182532019-09-30T06:29:59Zhttp://cds.cern.ch/record/1118253engBellodi, GEshraqi, MLallement, J BLombardi, A MUpdated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)Accelerators and Storage RingsAt the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer line layout, as was described in the document ABâNoteâ2007â037. For radiological safety reasons the distance between the planned SPL tunnel and the basement of building 513 had to be increased, and this led to the decision to lower the Linac4 machine by 2.5m. A vertical ramp was consequently introduced in the transfer line to raise the beam at the same level of LINAC2/PSB for connection to the existing transfer line. A series of error study runs has been carried out on the modified layout to have an estimate of the losses induced by quadrupole alignment and field errors. The two worst cases of each error family have been used as case studies to test the efficiency of possible steering strategies in minimizing beam losses and machine activation. The new layout and beam dynamics issues plus the results of the error and steering studies are discussed in this note.CERN-AB-Note-2008-036oai:cds.cern.ch:11182532008-07-31 |
spellingShingle | Accelerators and Storage Rings Bellodi, G Eshraqi, M Lallement, J B Lombardi, A M Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title | Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title_full | Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title_fullStr | Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title_full_unstemmed | Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title_short | Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option) |
title_sort | updated layout of the linac4 transfer line to the ps booster (green field option) |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1118253 |
work_keys_str_mv | AT bellodig updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption AT eshraqim updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption AT lallementjb updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption AT lombardiam updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption |