Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)

At the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer l...

Descripción completa

Detalles Bibliográficos
Autores principales: Bellodi, G, Eshraqi, M, Lallement, J B, Lombardi, A M
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1118253
_version_ 1780914464652001280
author Bellodi, G
Eshraqi, M
Lallement, J B
Lombardi, A M
author_facet Bellodi, G
Eshraqi, M
Lallement, J B
Lombardi, A M
author_sort Bellodi, G
collection CERN
description At the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer line layout, as was described in the document AB‐Note‐2007‐037. For radiological safety reasons the distance between the planned SPL tunnel and the basement of building 513 had to be increased, and this led to the decision to lower the Linac4 machine by 2.5m. A vertical ramp was consequently introduced in the transfer line to raise the beam at the same level of LINAC2/PSB for connection to the existing transfer line. A series of error study runs has been carried out on the modified layout to have an estimate of the losses induced by quadrupole alignment and field errors. The two worst cases of each error family have been used as case studies to test the efficiency of possible steering strategies in minimizing beam losses and machine activation. The new layout and beam dynamics issues plus the results of the error and steering studies are discussed in this note.
id cern-1118253
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11182532019-09-30T06:29:59Zhttp://cds.cern.ch/record/1118253engBellodi, GEshraqi, MLallement, J BLombardi, A MUpdated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)Accelerators and Storage RingsAt the time of defining the site of Linac4 and its integration in the complex of existing infrastructure at CERN (together with the plans for a future Superconducting Proton Linac), a series of radiation protection issues emerged that have since prompted a revision of the Linac4 to PSB transfer line layout, as was described in the document AB‐Note‐2007‐037. For radiological safety reasons the distance between the planned SPL tunnel and the basement of building 513 had to be increased, and this led to the decision to lower the Linac4 machine by 2.5m. A vertical ramp was consequently introduced in the transfer line to raise the beam at the same level of LINAC2/PSB for connection to the existing transfer line. A series of error study runs has been carried out on the modified layout to have an estimate of the losses induced by quadrupole alignment and field errors. The two worst cases of each error family have been used as case studies to test the efficiency of possible steering strategies in minimizing beam losses and machine activation. The new layout and beam dynamics issues plus the results of the error and steering studies are discussed in this note.CERN-AB-Note-2008-036oai:cds.cern.ch:11182532008-07-31
spellingShingle Accelerators and Storage Rings
Bellodi, G
Eshraqi, M
Lallement, J B
Lombardi, A M
Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title_full Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title_fullStr Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title_full_unstemmed Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title_short Updated layout of the LINAC4 transfer line to the PS Booster (Green Field Option)
title_sort updated layout of the linac4 transfer line to the ps booster (green field option)
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1118253
work_keys_str_mv AT bellodig updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption
AT eshraqim updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption
AT lallementjb updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption
AT lombardiam updatedlayoutofthelinac4transferlinetothepsboostergreenfieldoption