Cargando…
Operation and consolidation: lifetime of equipment and priorities TS
Since 1999 the TS department has benchmarked his services with the industry and other research laboratories and has prepared several consolidation plans. An evaluation of the results obtained from the different consolidation plans will be summarized. The difference between the projects achieved and...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1119306 |
_version_ | 1780914498425585664 |
---|---|
author | Béjar-Alonso, Isabel |
author_facet | Béjar-Alonso, Isabel |
author_sort | Béjar-Alonso, Isabel |
collection | CERN |
description | Since 1999 the TS department has benchmarked his services with the industry and other research laboratories and has prepared several consolidation plans. An evaluation of the results obtained from the different consolidation plans will be summarized. The difference between the projects achieved and those planned will be analyzed. The impact of the differed consolidation and of the maintenance backlog will be analyzed in order to present the future TS consolidation strategy |
id | cern-1119306 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11193062019-09-30T06:29:59Zhttp://cds.cern.ch/record/1119306engBéjar-Alonso, IsabelOperation and consolidation: lifetime of equipment and priorities TSEngineeringSince 1999 the TS department has benchmarked his services with the industry and other research laboratories and has prepared several consolidation plans. An evaluation of the results obtained from the different consolidation plans will be summarized. The difference between the projects achieved and those planned will be analyzed. The impact of the differed consolidation and of the maintenance backlog will be analyzed in order to present the future TS consolidation strategyCERN-TS-Note-2008-011EDMS936529oai:cds.cern.ch:11193062008-05-27 |
spellingShingle | Engineering Béjar-Alonso, Isabel Operation and consolidation: lifetime of equipment and priorities TS |
title | Operation and consolidation: lifetime of equipment and priorities TS |
title_full | Operation and consolidation: lifetime of equipment and priorities TS |
title_fullStr | Operation and consolidation: lifetime of equipment and priorities TS |
title_full_unstemmed | Operation and consolidation: lifetime of equipment and priorities TS |
title_short | Operation and consolidation: lifetime of equipment and priorities TS |
title_sort | operation and consolidation: lifetime of equipment and priorities ts |
topic | Engineering |
url | http://cds.cern.ch/record/1119306 |
work_keys_str_mv | AT bejaralonsoisabel operationandconsolidationlifetimeofequipmentandprioritiests |