Cargando…
Simulation of the pressure recovery time in a CLIC standard module
Vacuum pressure inside the CLIC accelerating structures (AS) is crucial for both beam and RF stability. Gas molecules released during RF breakdown must be evacuated from the cells of the AS before the arrival of the next train of particles. Due to its complex geometry, accurate analytical calculatio...
Autor principal: | Costa-Pinto, P |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1119517 |
Ejemplares similares
-
Klystron Modulators for the 3 TeV CLIC Scheme: An Overview
por: Pearce, P
Publicado: (2001) -
Active Alignment System for CLIC 30 GHz Modules in CTF2
por: Bouché, J M, et al.
Publicado: (1998) -
Optimal Power System and Grid Interface Design Considerations for the CLICs Klystron Modulators
por: Marija, Jankovic, et al.
Publicado: (2015) -
DC Breakdown experiments for CLIC
por: Descoeudres, A, et al.
Publicado: (2008) -
CLIC wall-plug power
por: Hübner, K
Publicado: (1992)