Cargando…
Experience with the infrastructure systems during the commissioning of the LHC
The commissioning activity which started in October 2005 consists in the short circuit tests, the commissioning of the non cryogenic systems and the finally the powering tests of the superconducting components of the LHC. During all theses phases, the infrastructure systems are brought into operatio...
Autor principal: | Saban, R |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1119538 |
Ejemplares similares
-
The Communication Infrastructure for the LHC
por: Parker, R
Publicado: (2000) -
LHC hardware commissioning
por: Saban, R
Publicado: (2003) -
The Global Strategy for Hardware Commissioning: The Role of AB, AT, EST and ST Divisions
por: Saban, R
Publicado: (2003) -
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
por: Barbero-Soto, E, et al.
Publicado: (2008) -
LHC Hardware Commissioning Summary
por: Saban, R I
Publicado: (2008)