Cargando…
Efficient job handling in the GRID: short deadline, interactivity, fault tolerance and parallelism
The major GRID infastructures are designed mainly for batch-oriented computing with coarse-grained jobs and relatively high job turnaround time. However many practical applications in natural and physical sciences may be easily parallelized and run as a set of smaller tasks which require little or n...
Autor principal: | Moscicki, Jakub |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1120621 |
Ejemplares similares
-
Reducing Deadline Miss Rate for Grid Workloads running in Virtual Machines: a deadline-aware and adaptive approach
por: Khalid, Omer
Publicado: (2011) -
Deadline aware virtual machine scheduler for scientific grids and cloud computing
por: Khalid, Omer, et al.
Publicado: (2010) -
Dynamic workload balancing of parallel applications with user-level scheduling on the Grid
por: Korkhov, Vladimir V, et al.
Publicado: (2009) -
A Fault Tolerant, Dynamic and Low Latency BDII Architecture for Grids
por: Osman, Asif, et al.
Publicado: (2012) -
Biomedical applications on the GRID: efficient management of parallel jobs
por: Moscicki, Jakub T, et al.
Publicado: (2004)