Cargando…

Beam Dynamics Issues in the CLIC Long Transfer Line

Both the main and the drive beam of the CLIC project must be transported from the central production site to the head of the main linacs over more than twenty kilometers. Over such distances chromatic error may be substantial. With long distances and large beam currents, ion-induced detuning and ins...

Descripción completa

Detalles Bibliográficos
Autores principales: Jeanneret, J B, Adli, E, Latina, A, Rumolo, G, Schulte, D, Tomás, R
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1122953
_version_ 1780914623575228416
author Jeanneret, J B
Adli, E
Latina, A
Rumolo, G
Schulte, D
Tomás, R
author_facet Jeanneret, J B
Adli, E
Latina, A
Rumolo, G
Schulte, D
Tomás, R
author_sort Jeanneret, J B
collection CERN
description Both the main and the drive beam of the CLIC project must be transported from the central production site to the head of the main linacs over more than twenty kilometers. Over such distances chromatic error may be substantial. With long distances and large beam currents, ion-induced detuning and instabilities and multi-bunch resistive wall effects must also be considered. These effects are quantified and simulated. Based on these results, a baseline design has been established.
id cern-1122953
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11229532023-07-20T15:07:02Zhttp://cds.cern.ch/record/1122953engJeanneret, J BAdli, ELatina, ARumolo, GSchulte, DTomás, RBeam Dynamics Issues in the CLIC Long Transfer LineAccelerators and Storage RingsBoth the main and the drive beam of the CLIC project must be transported from the central production site to the head of the main linacs over more than twenty kilometers. Over such distances chromatic error may be substantial. With long distances and large beam currents, ion-induced detuning and instabilities and multi-bunch resistive wall effects must also be considered. These effects are quantified and simulated. Based on these results, a baseline design has been established.CERN-AB-2008-022CLIC-Note-761EUROTeV-Report-2008-035oai:cds.cern.ch:11229532008-08-29
spellingShingle Accelerators and Storage Rings
Jeanneret, J B
Adli, E
Latina, A
Rumolo, G
Schulte, D
Tomás, R
Beam Dynamics Issues in the CLIC Long Transfer Line
title Beam Dynamics Issues in the CLIC Long Transfer Line
title_full Beam Dynamics Issues in the CLIC Long Transfer Line
title_fullStr Beam Dynamics Issues in the CLIC Long Transfer Line
title_full_unstemmed Beam Dynamics Issues in the CLIC Long Transfer Line
title_short Beam Dynamics Issues in the CLIC Long Transfer Line
title_sort beam dynamics issues in the clic long transfer line
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1122953
work_keys_str_mv AT jeanneretjb beamdynamicsissuesinthecliclongtransferline
AT adlie beamdynamicsissuesinthecliclongtransferline
AT latinaa beamdynamicsissuesinthecliclongtransferline
AT rumolog beamdynamicsissuesinthecliclongtransferline
AT schulted beamdynamicsissuesinthecliclongtransferline
AT tomasr beamdynamicsissuesinthecliclongtransferline