Cargando…
Fast Vertical Beam Instability in the CTF3 Combiner Ring
The CLIC Test Facility CTF3 is being built at CERN by an international collaboration, in order to demonstrate the main feasibility issues of the CLIC two-beam technology by 2010. The facility includes an 84 m combiner ring, which was installed and put into operation in 2007. High-current operation h...
Autores principales: | Corsini, R, Alesini, D, Biscari, C, Ghigo, A, Schulte, D, Skowronski, P K, Tecker, F |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1122959 |
Ejemplares similares
-
CTF3 Combiner Ring Commissioning
por: Tecker, F, et al.
Publicado: (2007) -
Experimental Studies on Drive Beam Generation in CTF3
por: Corsini, R, et al.
Publicado: (2008) -
Longitudinal Phase Space Characterization of the CTF3 Beam with the RF Deflector
por: Alesini, David, et al.
Publicado: (2004) -
Beam instability induced by rf deflectors in the combiner ring of the CLIC test facility and mitigation by damped deflecting structures
por: Alesini, D, et al.
Publicado: (2011) -
CTF3: Design of Driving Beam Combiner Ring
por: Biscari, C, et al.
Publicado: (2001)