Experimental Studies on Drive Beam Generation in CTF3
The objective of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to demonstrate the main feasibility issues of the CLIC two-beam technology by 2010. CTF3 consists of a 150 MeV electron linac followed by a 42 m long delay loop, an 84 m combiner ring and a two-beam tes...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1123153 |
_version_ | 1780914632919089152 |
---|---|
author | Corsini, R Bettoni, S Biscari, C Chao, Y Döbert, S Ghigo, A Tecker, F Skowronski, P |
author_facet | Corsini, R Bettoni, S Biscari, C Chao, Y Döbert, S Ghigo, A Tecker, F Skowronski, P |
author_sort | Corsini, R |
collection | CERN |
description | The objective of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to demonstrate the main feasibility issues of the CLIC two-beam technology by 2010. CTF3 consists of a 150 MeV electron linac followed by a 42 m long delay loop, an 84 m combiner ring and a two-beam test area. One keyissue studied in CTF3 is the efficient generation of a very high current drive beam, used in CLIC as the power source for the acceleration of the main beam to multi-TeV energies. The beam current is first doubled in the delay loop and then multiplied again by a factor four in the combiner ring by interleaving bunches using transverse deflecting RF cavities. The combiner ring and the connecting transfer line have been installed and put into operation in 2007. In this paper we give the status of the commissioning, illustrate the beam optics measurements, discuss the main issues and present the results of the combination tests. |
id | cern-1123153 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11231532023-07-20T15:03:48Zhttp://cds.cern.ch/record/1123153engCorsini, RBettoni, SBiscari, CChao, YDöbert, SGhigo, ATecker, FSkowronski, PExperimental Studies on Drive Beam Generation in CTF3Accelerators and Storage RingsThe objective of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to demonstrate the main feasibility issues of the CLIC two-beam technology by 2010. CTF3 consists of a 150 MeV electron linac followed by a 42 m long delay loop, an 84 m combiner ring and a two-beam test area. One keyissue studied in CTF3 is the efficient generation of a very high current drive beam, used in CLIC as the power source for the acceleration of the main beam to multi-TeV energies. The beam current is first doubled in the delay loop and then multiplied again by a factor four in the combiner ring by interleaving bunches using transverse deflecting RF cavities. The combiner ring and the connecting transfer line have been installed and put into operation in 2007. In this paper we give the status of the commissioning, illustrate the beam optics measurements, discuss the main issues and present the results of the combination tests.CERN-AB-2008-029CLIC-Note-751oai:cds.cern.ch:11231532008-09-01 |
spellingShingle | Accelerators and Storage Rings Corsini, R Bettoni, S Biscari, C Chao, Y Döbert, S Ghigo, A Tecker, F Skowronski, P Experimental Studies on Drive Beam Generation in CTF3 |
title | Experimental Studies on Drive Beam Generation in CTF3 |
title_full | Experimental Studies on Drive Beam Generation in CTF3 |
title_fullStr | Experimental Studies on Drive Beam Generation in CTF3 |
title_full_unstemmed | Experimental Studies on Drive Beam Generation in CTF3 |
title_short | Experimental Studies on Drive Beam Generation in CTF3 |
title_sort | experimental studies on drive beam generation in ctf3 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1123153 |
work_keys_str_mv | AT corsinir experimentalstudiesondrivebeamgenerationinctf3 AT bettonis experimentalstudiesondrivebeamgenerationinctf3 AT biscaric experimentalstudiesondrivebeamgenerationinctf3 AT chaoy experimentalstudiesondrivebeamgenerationinctf3 AT doberts experimentalstudiesondrivebeamgenerationinctf3 AT ghigoa experimentalstudiesondrivebeamgenerationinctf3 AT teckerf experimentalstudiesondrivebeamgenerationinctf3 AT skowronskip experimentalstudiesondrivebeamgenerationinctf3 |