Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
During hardware commissioning of the Large Hadron Collider (LHC), 8 main dipole circuits are tested at 1.9 K and up to their nominal current. Each dipole circuit contains 154 magnets of 15 m length, and has a total stored energy of up to 1.3 GJ. All magnets are wound from Nb-Ti superconducting Ruthe...
Autores principales: | Verweij, A, Baggiolini, V, Ballarino, A, Bellesia, B, Bordry, Frederick, Cantone, A, Casas Lino, M, Castaneda Serra, A, Castillo Trello, C, Catalan-Lasheras, N, Charifoulline, Z, Coelingh, G, Dahlerup-Petersen, K, D'Angelo, G, Denz, R, Fehér, S, Flora, R, Gruwé, M, Kain, V, Khomenko, B, Kirby, G, MacPherson, A, Marqueta Barbero, A, Mess, K H, Modena, M, Mompo, R, Montabonnet, V, le Naour, S, Nisbet, D, Parma, V, Pojer, M, Ponce, L, Raimondo, A, Redaelli, S, Reymond, H, Richter, D, de Rijk, G, Rijllart, A, Romera Ramirez, I, Saban, R, Sanfilippo, S, Schmidt, R, Siemko, A, Solfaroli Camillocci, M, Thurel, Y, Thiessen, H, Venturini-Delsolaro, W, Vergara Fernandez, A, Wolf, R, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124069 |
Ejemplares similares
-
Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC
por: Venturini-Delsolaro, W, et al.
Publicado: (2008) -
The Commissioning of the LHC Technical Systems
por: Saban, R, et al.
Publicado: (2007) -
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
por: Barbero-Soto, E, et al.
Publicado: (2008) -
Systems performance: Circuits
por: Antoine, A, et al.
Publicado: (2019) -
Upgrade of the Quench Protection Systems for the Superconducting Circuits of the LHC Machine at CERN: From Concept and Design to the First Operational Experience
por: Formenti, F, et al.
Publicado: (2010)