Commissioning of the 400 MHz LHC RF System
The installation of the 400 MHz superconducting RF system in LHC is finished and commissioning is under way. The final RF system comprises four cryo-modules each with four cavities in the LHC tunnel straight section round IP4. Also underground in an adjacent cavern shielded from the main tunnel are...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124089 |
_version_ | 1780914664474935296 |
---|---|
author | Ciapala, Edmond Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Linnecar, T Maesen, P Molendijk, J Montesinos, E Valuch, D Weierud, F |
author_facet | Ciapala, Edmond Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Linnecar, T Maesen, P Molendijk, J Montesinos, E Valuch, D Weierud, F |
author_sort | Ciapala, Edmond |
collection | CERN |
description | The installation of the 400 MHz superconducting RF system in LHC is finished and commissioning is under way. The final RF system comprises four cryo-modules each with four cavities in the LHC tunnel straight section round IP4. Also underground in an adjacent cavern shielded from the main tunnel are the sixteen 300 kW klystron RF power sources with their high voltage bunkers, two Faraday cages containing RF feedback and beam control electronics, and racks containing all the slow controls. The system and the experience gained during commissioning will be described. In particular, results from conditioning the cavities and their movable main power couplers and the setting up of the low level RF feedbacks will be presented. |
id | cern-1124089 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11240892023-05-31T13:24:13Zhttp://cds.cern.ch/record/1124089engCiapala, EdmondArnaudon, LBaudrenghien, PBrunner, OButterworth, ALinnecar, TMaesen, PMolendijk, JMontesinos, EValuch, DWeierud, FCommissioning of the 400 MHz LHC RF SystemAccelerators and Storage RingsThe installation of the 400 MHz superconducting RF system in LHC is finished and commissioning is under way. The final RF system comprises four cryo-modules each with four cavities in the LHC tunnel straight section round IP4. Also underground in an adjacent cavern shielded from the main tunnel are the sixteen 300 kW klystron RF power sources with their high voltage bunkers, two Faraday cages containing RF feedback and beam control electronics, and racks containing all the slow controls. The system and the experience gained during commissioning will be described. In particular, results from conditioning the cavities and their movable main power couplers and the setting up of the low level RF feedbacks will be presented.LHC-PROJECT-Report-1147CERN-LHC-PROJECT-Report-1147oai:cds.cern.ch:11240892008-09-04 |
spellingShingle | Accelerators and Storage Rings Ciapala, Edmond Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Linnecar, T Maesen, P Molendijk, J Montesinos, E Valuch, D Weierud, F Commissioning of the 400 MHz LHC RF System |
title | Commissioning of the 400 MHz LHC RF System |
title_full | Commissioning of the 400 MHz LHC RF System |
title_fullStr | Commissioning of the 400 MHz LHC RF System |
title_full_unstemmed | Commissioning of the 400 MHz LHC RF System |
title_short | Commissioning of the 400 MHz LHC RF System |
title_sort | commissioning of the 400 mhz lhc rf system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1124089 |
work_keys_str_mv | AT ciapalaedmond commissioningofthe400mhzlhcrfsystem AT arnaudonl commissioningofthe400mhzlhcrfsystem AT baudrenghienp commissioningofthe400mhzlhcrfsystem AT brunnero commissioningofthe400mhzlhcrfsystem AT butterwortha commissioningofthe400mhzlhcrfsystem AT linnecart commissioningofthe400mhzlhcrfsystem AT maesenp commissioningofthe400mhzlhcrfsystem AT molendijkj commissioningofthe400mhzlhcrfsystem AT montesinose commissioningofthe400mhzlhcrfsystem AT valuchd commissioningofthe400mhzlhcrfsystem AT weierudf commissioningofthe400mhzlhcrfsystem |