Cargando…
Commissioning of the 400 MHz LHC RF System
The installation of the 400 MHz superconducting RF system in LHC is finished and commissioning is under way. The final RF system comprises four cryo-modules each with four cavities in the LHC tunnel straight section round IP4. Also underground in an adjacent cavern shielded from the main tunnel are...
Autores principales: | Ciapala, Edmond, Arnaudon, L, Baudrenghien, P, Brunner, O, Butterworth, A, Linnecar, T, Maesen, P, Molendijk, J, Montesinos, E, Valuch, D, Weierud, F |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124089 |
Ejemplares similares
-
First Beam Commissioning of the 400 MHz LHC RF System
por: Butterworth, A C, et al.
Publicado: (2009) -
Control of the LHC 400 MHz RF System (ACS)
por: Arnaudon, L, et al.
Publicado: (2004) -
Hardware and Initial Beam Commissioning of the LHC RF Systems
por: Linnecar, T, et al.
Publicado: (2008) -
Digital Design Of The LHC Low Level rf: The Tuning System For The Superconducting Cavities
por: Baudrenghien, P, et al.
Publicado: (2006) -
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014)