Cargando…

LHC Transverse Feedback System and its Hardware Commissioning

A powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise coupled bunch instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors and injection kicker ripple. The transverse...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Gorbachev, E V, Höfle, Wolfgang, Killing, F, Kojevnikov, I, Kotzian, G, Lebedev, N I, Louwerse, R, Makarov, A A, Montesinos, E, Rabtsun, S V, Rossi, V, Schokker, M, Thepenier, E, Valuch, D, Zhabitsky, V
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1124090
_version_ 1780914664688844800
author Baudrenghien, P
Gorbachev, E V
Höfle, Wolfgang
Killing, F
Kojevnikov, I
Kotzian, G
Lebedev, N I
Louwerse, R
Makarov, A A
Montesinos, E
Rabtsun, S V
Rossi, V
Schokker, M
Thepenier, E
Valuch, D
Zhabitsky, V
author_facet Baudrenghien, P
Gorbachev, E V
Höfle, Wolfgang
Killing, F
Kojevnikov, I
Kotzian, G
Lebedev, N I
Louwerse, R
Makarov, A A
Montesinos, E
Rabtsun, S V
Rossi, V
Schokker, M
Thepenier, E
Valuch, D
Zhabitsky, V
author_sort Baudrenghien, P
collection CERN
description A powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise coupled bunch instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors and injection kicker ripple. The transverse damper can also be used as an exciter for purposes of abort gap cleaning or tune measurement. The power and lowlevel systems layouts are described along with results from the hardware commissioning. The achieved performance is compared with earlier predictions and requirements for injection damping and instability control.
id cern-1124090
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11240902023-05-31T13:24:14Zhttp://cds.cern.ch/record/1124090engBaudrenghien, PGorbachev, E VHöfle, WolfgangKilling, FKojevnikov, IKotzian, GLebedev, N ILouwerse, RMakarov, A AMontesinos, ERabtsun, S VRossi, VSchokker, MThepenier, EValuch, DZhabitsky, VLHC Transverse Feedback System and its Hardware CommissioningAccelerators and Storage RingsA powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise coupled bunch instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors and injection kicker ripple. The transverse damper can also be used as an exciter for purposes of abort gap cleaning or tune measurement. The power and lowlevel systems layouts are described along with results from the hardware commissioning. The achieved performance is compared with earlier predictions and requirements for injection damping and instability control.LHC-PROJECT-Report-1148CERN-LHC-PROJECT-Report-1148oai:cds.cern.ch:11240902008-09-04
spellingShingle Accelerators and Storage Rings
Baudrenghien, P
Gorbachev, E V
Höfle, Wolfgang
Killing, F
Kojevnikov, I
Kotzian, G
Lebedev, N I
Louwerse, R
Makarov, A A
Montesinos, E
Rabtsun, S V
Rossi, V
Schokker, M
Thepenier, E
Valuch, D
Zhabitsky, V
LHC Transverse Feedback System and its Hardware Commissioning
title LHC Transverse Feedback System and its Hardware Commissioning
title_full LHC Transverse Feedback System and its Hardware Commissioning
title_fullStr LHC Transverse Feedback System and its Hardware Commissioning
title_full_unstemmed LHC Transverse Feedback System and its Hardware Commissioning
title_short LHC Transverse Feedback System and its Hardware Commissioning
title_sort lhc transverse feedback system and its hardware commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1124090
work_keys_str_mv AT baudrenghienp lhctransversefeedbacksystemanditshardwarecommissioning
AT gorbachevev lhctransversefeedbacksystemanditshardwarecommissioning
AT hoflewolfgang lhctransversefeedbacksystemanditshardwarecommissioning
AT killingf lhctransversefeedbacksystemanditshardwarecommissioning
AT kojevnikovi lhctransversefeedbacksystemanditshardwarecommissioning
AT kotziang lhctransversefeedbacksystemanditshardwarecommissioning
AT lebedevni lhctransversefeedbacksystemanditshardwarecommissioning
AT louwerser lhctransversefeedbacksystemanditshardwarecommissioning
AT makarovaa lhctransversefeedbacksystemanditshardwarecommissioning
AT montesinose lhctransversefeedbacksystemanditshardwarecommissioning
AT rabtsunsv lhctransversefeedbacksystemanditshardwarecommissioning
AT rossiv lhctransversefeedbacksystemanditshardwarecommissioning
AT schokkerm lhctransversefeedbacksystemanditshardwarecommissioning
AT thepeniere lhctransversefeedbacksystemanditshardwarecommissioning
AT valuchd lhctransversefeedbacksystemanditshardwarecommissioning
AT zhabitskyv lhctransversefeedbacksystemanditshardwarecommissioning