Results from Commissioning of the Energy Extraction Facilities of the LHC Machine
The risk of damage to the superconducting magnets, bus bars and current leads of the LHC machine in case of a resistive transition (quench) is being minimized by adequate protection. The protection is based on early quench detection, bypassing the quenching magnets by cold diodes, energy density dil...
Autores principales: | Coelingh, G J, Dahlerup-Petersen, K, Mess, K H |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124098 |
Ejemplares similares
-
The CERN/LHC energy extraction switches and their arc detector system
por: Dahlerup-Petersen, K, et al.
Publicado: (2004) -
Arc detector system for extraction switches in LHC CERN
por: Dahlerup-Petersen, K, et al.
Publicado: (2006) -
Design and operational aspects of a bi-polar semi-conductor switch as possible candidate for replacement of electro-mechanical switchgear in energy extraction systems for the LHC corrector magnet circuits
por: Coelingh, G J, et al.
Publicado: (2014) -
Test results of a 7.5 kA semi-conductor prototype switch as modular switchgear in energy extraction systems for the HL-LHC magnet test facility
por: Coelingh, G J, et al.
Publicado: (2016) -
Commissioning of the LHC Current Leads
por: Ballarino, A, et al.