Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC
The LHC is a complex machine requiring more than 7400 superconducting corrector magnets distributed along a circumference of 26.7 km. These magnets are powered in 1446 different electrical circuits at currents ranging from 60Â A up to 600 A. Among the corrector circuits the 600 A corrector magnets f...
Autores principales: | Venturini-Delsolaro, W, Baggiolini, V, Ballarino, A, Bellesia, B, Bordry, Frederick, Cantone, A, Casas Lino, M, Castaneda Serra, A, Castillo Trello, C, Catalan-Lasheras, N, Charifoulline, Z, Charrondiere, C, Dahlerup-Petersen, K, D'Angelo, G, Denz, R, Fehér, S, Flora, R, Gruwé, M, Kain, V, Karppinen, M, Khomenko, B, Kirby, G, MacPherson, A, Marqueta Barbero, A, Mess, K H, Modena, M, Mompo, R, Montabonnet, V, le Naour, S, Nisbet, D, Parma, V, Pojer, M, Ponce, L, Raimondo, A, Redaelli, S, Remondino, V, Reymond, H, de Rijk, G, Rijllart, A, Romera Ramirez, I, Saban, R, Sanfilippo, S, Schirm, K, Schmidt, R, Siemko, A, Solfaroli Camillocci, M, Thurel, Y, Thiesen, H, Vergara Fernandez, A, Verweij, A, Wolf, R, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124100 |
Ejemplares similares
-
Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
por: Verweij, A, et al.
Publicado: (2008) -
The Commissioning of the LHC Technical Systems
por: Saban, R, et al.
Publicado: (2007) -
Impact of the Voltage Transients after a Fast Power Abort on the Quench Detection System in the LHC Main Dipole Chain
por: Ravaioli, E, et al.
Publicado: (2012) -
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
por: Barbero-Soto, E, et al.
Publicado: (2008) -
Splice Resistance Measurements in the LHC Main Superconducting Magnet Circuits by the New Quench Protection System
por: Charifoulline, Z, et al.
Publicado: (2012)