Results from the CLIC Test Facility CFT3 and update on the CLIC Design

The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the n...

Descripción completa

Detalles Bibliográficos
Autor principal: Geschonke, Günther
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1124104
_version_ 1780914666631856128
author Geschonke, Günther
author_facet Geschonke, Günther
author_sort Geschonke, Günther
collection CERN
description The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.
id cern-1124104
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11241042023-07-20T15:06:52Zhttp://cds.cern.ch/record/1124104engGeschonke, GüntherResults from the CLIC Test Facility CFT3 and update on the CLIC DesignAccelerators and Storage RingsThe CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.CERN-AB-2008-046CLIC-Note-742oai:cds.cern.ch:11241042008-09-04
spellingShingle Accelerators and Storage Rings
Geschonke, Günther
Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title_full Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title_fullStr Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title_full_unstemmed Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title_short Results from the CLIC Test Facility CFT3 and update on the CLIC Design
title_sort results from the clic test facility cft3 and update on the clic design
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1124104
work_keys_str_mv AT geschonkegunther resultsfromtheclictestfacilitycft3andupdateontheclicdesign