Results from the CLIC Test Facility CFT3 and update on the CLIC Design
The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the n...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124104 |
_version_ | 1780914666631856128 |
---|---|
author | Geschonke, Günther |
author_facet | Geschonke, Günther |
author_sort | Geschonke, Günther |
collection | CERN |
description | The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented. |
id | cern-1124104 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11241042023-07-20T15:06:52Zhttp://cds.cern.ch/record/1124104engGeschonke, GüntherResults from the CLIC Test Facility CFT3 and update on the CLIC DesignAccelerators and Storage RingsThe CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.CERN-AB-2008-046CLIC-Note-742oai:cds.cern.ch:11241042008-09-04 |
spellingShingle | Accelerators and Storage Rings Geschonke, Günther Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title | Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title_full | Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title_fullStr | Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title_full_unstemmed | Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title_short | Results from the CLIC Test Facility CFT3 and update on the CLIC Design |
title_sort | results from the clic test facility cft3 and update on the clic design |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1124104 |
work_keys_str_mv | AT geschonkegunther resultsfromtheclictestfacilitycft3andupdateontheclicdesign |