Cargando…
Results from the CLIC Test Facility CFT3 and update on the CLIC Design
The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the n...
Autor principal: | Geschonke, Günther |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124104 |
Ejemplares similares
-
Results from the CLIC Test Facility CTF3 and Update on the CLIC Design
por: Geschonke, Günther
Publicado: (2008) -
Status of the CLIC Test Facility (CTF3)
por: Geschonke, Günther
Publicado: (2006) -
Results from the CLIC Test Facility
por: Braun, H, et al.
Publicado: (1996) -
Results from the CLIC test facility
por: Braun, HH, et al.
Publicado: (1996) -
The TBTS facility for the CLIC project
por: Gunther Geschonke
Publicado: (2008)