Cargando…
Abort Gap Cleaning using the Transverse Feedback System: Simulation and Measurements in the SPS for the LHC Beam Dump System
The critical and delicate process of dumping the beams of the LHC requires very low particle densities within the $3 \mu$s of the dump kicker rising edge. High beam population in this so-called 'abort gap' might cause magnet quenches or even damage. Constant refilling due to diffusion proc...
Autores principales: | Koschik, A, Goddard, B, Höfle, Wolfgang, Kotzian, G, Kramer, Daniel, Kramer, T |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1124316 |
Ejemplares similares
-
LHC Abort Gap Cleaning with the Transverse Damper
por: Gianfelice-Wendt, E, et al.
Publicado: (2009) -
Apertures in the LHC Beam Dump System and Beam Losses During Beam Abort
por: Kramer, T, et al.
Publicado: (2008) -
Experience Gained in the SPS for the Future LHC Abort Gap Cleaning
por: Höfle, Wolfgang
Publicado: (2004) -
Experience Gained in the SPS for the Future LHC Abort Gap Cleaning
por: Höfle, Wolfgang
Publicado: (2004) -
Studies of Beam Losses from Failures of SPS Beam Dump Kickers
por: Kramer, T, et al.
Publicado: (2007)