Cargando…
Careful positioning of the trolley containing the detector for the A-side on its transport support.
Autor principal: | Jans, E |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1125561 |
Ejemplares similares
-
The two VELO detector halves, mounted in their trolleys, waiting in the assembly lab in Bld. 168, for transport to the pit.
por: Jans, E
Publicado: (2007) -
Lifting of the detector in the air-suspensed truck
por: Jans, E
Publicado: (2007) -
Loading of the truck for transport from Meyrin to IP8
por: Jans, E
Publicado: (2007) -
View at the inside of the VELO-vessel: the RF-box with slots for the 2 Pile-Up and 21 VELO-modules. Also visible are the 2 ion getter pumps below the vessel and the belt that drives the x-movement of the module base.
por: Jans, E
Publicado: (2007) -
The silicon detectors
Publicado: (1998)