Cargando…
Loading of the truck for transport from Meyrin to IP8
Preparations for unloading of the A-side detector at the pit of LHCb. Unloading of the A-side detector from the truck.Lowering of the detector through the shaft.Reappearance of the detector from the shaft in the pit.Both detector halves have arrived in the pit and are parked safely awaiting further...
Autor principal: | Jans, E |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1127345 |
Ejemplares similares
-
Lifting of the detector in the air-suspensed truck
por: Jans, E
Publicado: (2007) -
Careful positioning of the trolley containing the detector for the A-side on its transport support.
por: Jans, E
Publicado: (2007) -
The two VELO detector halves, mounted in their trolleys, waiting in the assembly lab in Bld. 168, for transport to the pit.
por: Jans, E
Publicado: (2007) -
View at the inside of the VELO-vessel: the RF-box with slots for the 2 Pile-Up and 21 VELO-modules. Also visible are the 2 ion getter pumps below the vessel and the belt that drives the x-movement of the module base.
por: Jans, E
Publicado: (2007) -
Three modules of the LHCb Vertex Locator in the H8 test beam in the North Area
por: Ruf, T
Publicado: (2008)