Cargando…
Run 127 - 29 November 1971, Rings 1 and 2 - FATA (10 FA) - 10.5 GeV/c - 4 bunches
Autores principales: | Autin, B, Laeger, H |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129834 |
Ejemplares similares
-
Run 127, 29th November 1971. 4 bunches, 10.5 GeV: Microwave signal observations, both rings
por: Bramham, P
Publicado: (1971) -
Run 100 - 25 August 1971, Rings 1 and 2 - 10.7 GeV/c - 4 bunches
por: Autin, B, et al.
Publicado: (1971) -
Run 103 - 30 August 1971, Rings 1 and 2 - p = 10.734 GeV/c - 20 bunches
por: Autin, B, et al.
Publicado: (1971) -
Run 129 - 1 December 1971, Ring 1 - FATA (15 FA) - 15 GeV/c - 20 bunches: Centering of a stack
por: Henrichsen, K N
Publicado: (1971) -
Run 127 (29.11.71), 10.5 GeV/c, 4 bunches, Ring 1 and Ring 2.: Survey of Beam Behaviour at 10.5 GeV/c
por: Keil, Eberhard
Publicado: (1971)