Cargando…
Runs 134, 135 and 136: Signals picked up during injection without r.f.
Autor principal: | Bramham, P |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129875 |
Ejemplares similares
-
Adjustment of R.F. pick-up electrodes on cavities for beam-control.
por: Lingjnerde, Tor
Publicado: (1959) -
Calculation of momentum spread from modulation period of signals observed in Run 135
por: Bramham, P
Publicado: (1972) -
Injection pick-up stations, Run 122, 9th November 1971
por: Unser, K
Publicado: (1971) -
Temperature controlled phase-reference cables in the R.F. separator
por: Bramham, P
Publicado: (1965) -
R.F. separator: master trigger generator and main modulator triggering
por: Bramham, P
Publicado: (1965)