Cargando…
Clearing studies using the Langmuir probe technique, Run 139, 22 GeV, 20 bunches
Autor principal: | Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129882 |
Ejemplares similares
-
Run 97, Ring 2, 22 GeV, 20 bunches, 22FA. clearing electrodes at +3.5/OKV
por: Gröbner, Oswald, et al.
Publicado: (1971) -
Run 93, 22 GeV, 20 bunches, Ring 2, 22 FA, Pressure rise when turning clearing electrodes off
por: Gröbner, Oswald
Publicado: (1971) -
Run 171, 17.5.1972, 22 GeV/c, 20 bunches, Ring 1: Stacking With Clearing Off
por: Gröbner, Oswald, et al.
Publicado: (1972) -
Optimal Clearing Conditions, Run 119, 22 GeV, 20 b, R1, 22 FB
por: Gröbner, Oswald
Publicado: (1971) -
Run 151, 22 GeV, 20 bunches, Ring 1, 22 FB: Electron production on scraper and dump block
por: Gröbner, Oswald
Publicado: (1972)