Cargando…
Run 142 - 1 March 1972 - 22.00 to 24.00h, Rings 1 and 2 - 26 GeV/c - 20 bunches: Determination of the effective height of a stack from the electromagnetic beam-beam interaction
Autor principal: | Autin, B |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129887 |
Ejemplares similares
-
Run 129, 22.00 - 24.00. Ring 2, 15 FA: Vertical Halo using Scraper with Counter Telescope
por: Montague, Brian William St. Leger, et al.
Publicado: (1971) -
Run 46 - 7 April 1971 - 21.00-24.00h, Both Rings, 22 GeV/c, 4 bunches
por: Autin, B, et al.
Publicado: (1971) -
Run 31 - 5 March 1971, Last Part: 23.00-24.00h
por: Gourber, J P
Publicado: (1971) -
Run 142 - 1 March 1972 - 18.30h to 22.00h, Ring 2 - 26 GeV/c inj. - 20 bunches: Acceleration of 20 bunches to 31.4 GeV/c
por: Borer, J, et al.
Publicado: (1972) -
Report on second half of Run 19. (22.00-23.00)
por: De Jonge, M J
Publicado: (1971)