Cargando…
Run 151, 22 GeV, 20 bunches, Ring 1, 22 FB: Electron production on scraper and dump block
Autor principal: | Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129903 |
Ejemplares similares
-
Run 151, 22 GeV/c, Ring 1, 20 bunches, 22 FB: Radial Betatron Amplitudes in Stack by Unstacking
por: Montague, Brian William St. Leger
Publicado: (1972) -
Optimal Clearing Conditions, Run 119, 22 GeV, 20 b, R1, 22 FB
por: Gröbner, Oswald
Publicado: (1971) -
Run 151, 22 GeV, 20 bunches, Ring 2: Betratron Amplitudes in Ring 2
por: Keil, Eberhard
Publicado: (1972) -
Run 97, Ring 2, 22 GeV, 20 bunches, 22FA. clearing electrodes at +3.5/OKV
por: Gröbner, Oswald, et al.
Publicado: (1971) -
Run 99, 22 GeV, 20 bunches, Ring 1, 22 FA, Artificial pressure bump in S51
por: Gröbner, Oswald, et al.
Publicado: (1971)