Cargando…
Run 164 - 1 May 1972 - 4h parasitic, Ring 1 - 15 GeV/c - 4 bunches
Autor principal: | Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129947 |
Ejemplares similares
-
Run 164, 1.5.1972, 15 GeV/c, 4 bunches: RF Scanning Test
por: De Jonge, M J
Publicado: (1972) -
Run 164 - 1st May 1972, Rings 1 and 2 - 15.404 GeV/c - 4 bunches: Working line for physics 15 FP (FATA-Physics)
por: Autin, B, et al.
Publicado: (1972) -
Run 163 - 26 April 1972 - 22 GeV/c - Rings 1 and 2, Run 164 - 1 May 1972 - 15 GeV/c - Ring 2, Run 168 - 5 may 1972 - 26 GeV/c - Ring 1: Stacking with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972) -
Run 57 - 24 May 1971, Ring 1 - 22 GeV/c - 4 bunches
por: Gourber, J P
Publicado: (1971) -
Run 152 - 27th March 1972 - Ring 2 - 26.624 GeV/c - 4 bunches, Run 168 - 5th May 1972 - Ring 1 - 26.594 GeV/c - 20 bunches: Working line for physics 26 FP (FATA Physics)
por: Gourber, J P, et al.
Publicado: (1972)