Cargando…
Run 123A. 11th November 1971. 20 bunches, 26 GeV: Microwave Signal Observations. Ring I only
Autor principal: | Bramham, P |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129979 |
Ejemplares similares
-
Run 126. 24th November 1971, 20 bunches, 22 GeV: Microwave signal observations (both rings)
por: Bramham, P
Publicado: (1971) -
Run 123A' - 12 November 1971, 26 GeV/c, 20 bunches: Correlations
por: Hübner, K
Publicado: (1971) -
Run 119, 3rd November 1971, 20 bunches, Run 120, 4th November 1971, 4 bunches: Microwave Signal Observations, both Rings
por: Bramham, P
Publicado: (1971) -
Run 127, 29th November 1971. 4 bunches, 10.5 GeV: Microwave signal observations, both rings
por: Bramham, P
Publicado: (1971) -
Run 129. 1 December, 1971. 20 bunches, 15 GeV: Microwave signal observations, Ring 2
por: Bramham, P
Publicado: (1971)