Cargando…
run 177 - 29 May 1972, Ring 1 - 26.624 GeV/c - 4 bunches: Working line for physics 26 FP
Autor principal: | Laeger, H |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129980 |
Ejemplares similares
-
Run 177 - 29 May 1972, Rings 1 and 2 - 26.624 GeV/c - 4 bunches Working line for Terwilliger scheme
por: Bryant, P J
Publicado: (1972) -
Run 152 - 27th March 1972 - Ring 2 - 26.624 GeV/c - 4 bunches, Run 168 - 5th May 1972 - Ring 1 - 26.594 GeV/c - 20 bunches: Working line for physics 26 FP (FATA Physics)
por: Gourber, J P, et al.
Publicado: (1972) -
Run 180P - 1 June 1972, Ring 1 - 26.624 GeV/c - 6 A: Periodic scraping of the outer beam edge, Scraping of the lower beam edge
por: Laeger, H
Publicado: (1972) -
Run 191 - 26 June 1972, Ring 1 - 26 GeV/c - 4 bunches: Working lines 26FP and 2C26 for Ring 1
por: Laeger, H
Publicado: (1972) -
Run 174 - 22 May 1972, Ring 1 - 26 GeV/c - 4 bunches: Working Line for physics 26FP
por: Autin, B
Publicado: (1972)