Cargando…
Run 181, 26 GeV/c, 2.6.1972: Reduction of effective height by scraping during acceleration
Autor principal: | Hübner, K |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129990 |
Ejemplares similares
-
Luminosity Measurement by Scraping, Run No. 325P, 26 GeV/c
por: Guignard, G
Publicado: (1973) -
Run 166P, 26 GeV/c, 3.5.1972: An Attempt to Analyse a Physics Run
por: Hübner, K
Publicado: (1972) -
Run 180P - 1 June 1972, Ring 1 - 26.624 GeV/c - 6 A: Periodic scraping of the outer beam edge, Scraping of the lower beam edge
por: Laeger, H
Publicado: (1972) -
Run 222, 1.9.1972, 26 GeV/c, Experimental Cavity at 26 GeV/c
por: Bramham, P, et al.
Publicado: (1972) -
Run 181 - 2 June 1972, Ring 2 - 26 GeV/c: Old physics beam, Collimator tests (continued)
por: Bryant, P J
Publicado: (1972)