Cargando…
"ISR Performance Report, Luminosity with shaved beams, Run 190: 21.6.1972"
Autor principal: | Blumer, T |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1129999 |
Ejemplares similares
-
Run 190, 21st June, 1972: Probing the Vacuum in Ring I by High Intensity Stacks
por: Fischer, E
Publicado: (1972) -
ISR luminosities between 29.2. and 5.5.1972
por: Hübner, K
Publicado: (1972) -
Run 259, 22.11.1972, 222 GeV/c. 20 bunches, ring 2, Injection Instability with shaved Beams
por: Zotter, B, et al.
Publicado: (1972) -
Run 239M - 18th October 1972, 22 GeV/c - Rings 1 and 2 - 5A to 8A, Shaving techniques for Maximum Luminosity
por: Laeger, H
Publicado: (1972) -
Atomic beam monitor for the ISR luminosity
por: Kouchnirenko, E, et al.
Publicado: (1970)