Cargando…
Run 193F - 28 June 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches: RF scraping of low energy tail
Autor principal: | Laeger, H |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130007 |
Ejemplares similares
-
Runs 192P/193P/194P - 27/28/29 June 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches: 8th order resonances in physics stacks
por: Laeger, H
Publicado: (1972) -
Run 180P - 1 June 1972, Ring 1 - 26.624 GeV/c - 6 A: Periodic scraping of the outer beam edge, Scraping of the lower beam edge
por: Laeger, H
Publicado: (1972) -
Run 191 - 26 June 1972, Ring 1 - 26 GeV/c - 4 bunches: Working lines 26FP and 2C26 for Ring 1
por: Laeger, H
Publicado: (1972) -
Run 194P- 30th June 1972, Ring 1 - 26.588 GeV/c - 5.5 A: Periodic Scraping of Lower Beam Edge
por: Laeger, H
Publicado: (1972) -
Run 68 - 9 June 1971, 20 bunches - 26 GeV - Ring 1, Stacking at the bottom with intermediate scraping of the tail
por: Resegotti, Lorenzo
Publicado: (1971)