Cargando…
Run 194P- 30th June 1972, Ring 1 - 26.588 GeV/c - 5.5 A: Periodic Scraping of Lower Beam Edge
Autor principal: | Laeger, H |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130009 |
Ejemplares similares
-
Run 796, 26.588 GeV/c, 10.1.77, Run 805, 26.588 GeV/c, 26.1.77, Run 823, 26.588 GeV/c, 17.3.77, Measurement of the magnetic hysteresis of the CR's and correction of its effect on the closed orbits
por: Wyss, C
Publicado: (1977) -
Run 180P - 1 June 1972, Ring 1 - 26.624 GeV/c - 6 A: Periodic scraping of the outer beam edge, Scraping of the lower beam edge
por: Laeger, H
Publicado: (1972) -
Run 609 - 30 May 1975, Ring 1 - 26.588 GeV/c, Matching tolerances
por: Autin, B, et al.
Publicado: (1975) -
Run 167P - 5th of May 1972 - 26.512 GeV/c, Scraping inner beam edge once - Ring 1, 7.3A: Periodic scraping inner beam edge - Ring 2, 6.6A
por: Laeger, H
Publicado: (1972) -
Run 193F - 28 June 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches: RF scraping of low energy tail
por: Laeger, H
Publicado: (1972)