Cargando…
Run 195 - 30 June 1972, Rings 1 & 2 - 26 GeV/c - 20 bunches: Does a luminosity measurement alter the effective height of a beam
Autor principal: | Autin, B |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130010 |
Ejemplares similares
-
Run 174 - 22 May 1972, Ring 1 - 26 GeV/c - 4 bunches: Working Line for physics 26FP
por: Autin, B
Publicado: (1972) -
Run 163 - 26 April 1972, Rings 1 and 2 - 22 GeV/c - 22 FP - 20 bunches
por: Autin, B
Publicado: (1972) -
Run 195, 26 GeV, 20 bunches, 30.6.72. Ring 1, 26 FP: Beam Pumping
por: Calder, R, et al.
Publicado: (1973) -
Run 191 - 26 June 1972, Ring 1 - 26 GeV/c - 4 bunches: Working lines 26FP and 2C26 for Ring 1
por: Laeger, H
Publicado: (1972) -
Run 246 - 30/31 October 1972, Ring 2 - 22 GeV/c - 20 bunches, Q-shift in a shaved stack
por: Autin, B, et al.
Publicado: (1972)