Cargando…
Run 195, 26 GeV, 20 bunches, 30.6.72. Ring 1, 26 FP: Beam Pumping
Autores principales: | Calder, R, Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130011 |
Ejemplares similares
-
Run 195, 30.6.72, Ring 1, 26 GeV/c, 20 bunches, 26 FP: Transverse signals seen in the beam-induced noise
por: Schnell, Wolfgang
Publicado: (1973) -
Run 260, 28.22.72. 26 GeV, Ring 1, 26 FP, Run 264, 01.12.72. 26 GeV, Ring 1, 26 FP, Desorption coefficients for hot and cold vacuum chambers
por: Calder, R, et al.
Publicado: (1972) -
Run 231, 20th September 1972, 26 GeV, Ring 1, 2 FP, Run 232, 25th September 1972, 26 GeV, Ring 1, 26 FP: Increased pumping speed and studies of surface conditions in section 333
por: Calder, R, et al.
Publicado: (1972) -
Run 199, 20.7.1972. 15 GeV/c, Ring 1. 15 FP, Run 204, 26.7.1972. 22 GeV/c, Ring 1 22 FP: Further Experiments on Beam Pumping in Section 333
por: Calder, R, et al.
Publicado: (1972) -
Run 199, 20.7.1972. 15 GeV/c, Ring 1. 15 FP, Run 204, 26.7.1972. 22 GeV/c, Ring 1. 22 FP: Further Experiments on Beam Pumping in Section 333
por: Calder, R, et al.
Publicado: (1972)