Cargando…
Run 199 - 24 July 1972, Ring 2 - 15.37 GeV/c - 20 bunches: 2 and 4 magnet vertical bumps in the intersection regions
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130023 |
Ejemplares similares
-
Run 199 - 20 July 1972, Rings 1 and 2 - 15.37 GeV/c - 20 bunches: Terwilliger scheme working line at 15 GeV/c
por: Bryant, P J
Publicado: (1972) -
Run 259 - 22 November 1972, Ring 1 - 22 GeV/c - 20 bunches, Meaurement of vertical closed orbit bumps for the Terwilliger machine
por: Bryant, P J
Publicado: (1973) -
Run 260 - 27 November 1972, Ring 1 - 26 GeV/c - 4 bunches, Heights of vertical closed orbit bumps across the aperture
por: Bryant, P J
Publicado: (1972) -
Run 246 - 30 October 1972, Ring 2 - 22 GeV/c - 20 bunches - 1 in 3 mode, Comparison and calibration of vertical closed orbit bumps for the normal machine
por: Bryant, P J
Publicado: (1972) -
Run 1284 - 15th July 1982, 26 GeV/c - Ring 1, Radial Bumps in I2 Intersection
por: Bryant, P J
Publicado: (1982)