Cargando…
Run 232, 25.09.72, 18-22h, Ring 2, 4 bunches, 26 GeV/c: Test of computerised RF System
Autores principales: | De Jonge, M J, Studer, M |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130070 |
Ejemplares similares
-
Run 232, 25.09.72, 18-22h. Ring 2, 4 bunches, 26 GeV/c: Test of computerised RF system
por: De Jonge, M J, et al.
Publicado: (1972) -
Beam loading compensation if RF Cavity No. 7: Run 430. Ring 1, 20 bunches, 26 GeV/c
por: Frischholz, Hans, et al.
Publicado: (1974) -
Run 264, 26 GeV, 1.12.72, Ring 2, Spill-out as function of RF voltage for shaved and unshaved beam
por: De Jonge, M J
Publicado: (1972) -
Runs 232 and 233F - 25 and 26 September 1972, Rings 1 and 2 - 20 bunches, Working lines CLEO (1.8, 1.8) above 26.5 GeV/c
por: Hansen, S, et al.
Publicado: (1972) -
Run 195, 26 GeV, 20 bunches, 30.6.72. Ring 1, 26 FP: Beam Pumping
por: Calder, R, et al.
Publicado: (1973)