Cargando…
Run 239 - 18 October 1972, Rings 1 and 2 - 22 GeV/c - 20 bunches: High intensity with the Terwilliger scheme
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130074 |
Ejemplares similares
-
Run 156 - 17th April 1972, Ring 1 - 22 GeV/c - 4 bunches: Terwilliger Scheme
por: Bryant, P J
Publicado: (1972) -
Run 250 - 1 November 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches, Higher intensities with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972) -
Run 259 - 22 November 1972, Ring 1 - 22 GeV/c - 20 bunches, Meaurement of vertical closed orbit bumps for the Terwilliger machine
por: Bryant, P J
Publicado: (1973) -
Run 199 - 20 July 1972, Rings 1 and 2 - 15.37 GeV/c - 20 bunches: Terwilliger scheme working line at 15 GeV/c
por: Bryant, P J
Publicado: (1972) -
Run 177 - 29 May 1972, Rings 1 and 2 - 26.624 GeV/c - 4 bunches Working line for Terwilliger scheme
por: Bryant, P J
Publicado: (1972)