Cargando…
Run no. 239, 22 GeV, 20b, R1, 18.10.72: Brickwall Indicator
Autores principales: | Hansen, S, Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130075 |
Ejemplares similares
-
Run 239, 18.10.72, 22 GeV/c: Observation of the Injection Instability in the Presence of Stacks
por: Zotter, B, et al.
Publicado: (1972) -
run 239, 18.10.72, 22 GeV/c: Observation of the Injection Instability in the Presence of Stacks
por: Zotter, B, et al.
Publicado: (1972) -
Run no. 272, 22 GeV, 20b, R2, 20.12.72, Further Brickwall Indicator Test
por: Peschardt, E
Publicado: (1973) -
Stability of shaved beam, Run 239 - 18.10.72, Ring 1 - 22 GeV/c - 22 FP
por: Hübner, K
Publicado: (1972) -
Stability of shaved beam, Run 239 - 18.10.72, Ring 1 - 22 GeV/c - 22 FP
por: Hübner, K
Publicado: (1972)