Cargando…
Automatic Injection Steering Tests, Run No. 40 (4 bunches, no RF)
Autores principales: | Kemp, D, Pett, J G |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130100 |
Ejemplares similares
-
Automatic Injection Optimisation - Run No. 65 (4 bunches, no RF)
por: Kemp, D F, et al.
Publicado: (1971) -
Automatic closed-loop injection steering into the ISR
por: Kemp, D, et al.
Publicado: (1972) -
Run 164, 1.5.1972, 15 GeV/c, 4 bunches: RF Scanning Test
por: De Jonge, M J
Publicado: (1972) -
Bunch Frequency Multiplication by RF Injection into an Isochronous Ring
por: Royer, P
Publicado: (2003) -
Run 40, 26.3.1971. 15 GeV, 4 bunches
por: Schnell, Wolfgang
Publicado: (1971)