Cargando…
Measurements with clearing electrodes at intersecting point I-6, Run 121, Ring 1 and 2, 15 GeV, 20 bunches, 15 FA in both rings
Autor principal: | Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130156 |
Ejemplares similares
-
Run 118, 15 GeV, 15 FA, 4 bunches
por: Gröbner, Oswald
Publicado: (1971) -
Run 97, Ring 2, 22 GeV, 20 bunches, 22FA. clearing electrodes at +3.5/OKV
por: Gröbner, Oswald, et al.
Publicado: (1971) -
Run 93, 22 GeV, 20 bunches, Ring 2, 22 FA, Pressure rise when turning clearing electrodes off
por: Gröbner, Oswald
Publicado: (1971) -
Run 87: Pressure effects when changing the clearing fields, 15 GeV, 20 bunches, Ring 1, FS15
por: Gröbner, Oswald
Publicado: (1971) -
Run 121. 4th November 1971, Longitudinal Instability Tests with RF-cavity in Ring I, 15 GeV, 20 bunches, working line 15 FA
por: Zotter, B, et al.
Publicado: (1971)