Cargando…
Addendum to the Report on 2nd ISR run, 2nd November 1970
Autores principales: | Autin, B, Borer, J, Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1970
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130177 |
Ejemplares similares
-
Report on 2nd ISR run, November 2, 1970 Circulating Beam Studies
por: Schnell, Wolfgang
Publicado: (1970) -
Report on 7th ISR run - November 13 1970, Horizontal Closed Orbit Correction
por: Autin, B, et al.
Publicado: (1970) -
Run 13 - 22nd January 1971
por: Autin, B, et al.
Publicado: (1971) -
Report on RF stacking during ISR Run 6, 11 November 1970
por: Schnell, Wolfgang
Publicado: (1970) -
Addendum to ISR Performance Report of 27.6.78 on, Very low current detection in the ISR, Run 953
por: Borer, J
Publicado: (1978)