Cargando…
Run 30, 26th February, first hours, Stacking 20 bunches with the shutter, protected the scraper
Autor principal: | de Raad, Bastiaan |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130271 |
Ejemplares similares
-
Increase of available stacking aperture by modification to the controls of the shutter protection scraper
por: Myers, S
Publicado: (1973) -
Run 30, 26.2.1971, 15 GeV. Ring 1, Last 1 1/2 hours: stacking at bottom with 20 bunches
por: Schnell, Wolfgang
Publicado: (1971) -
Run 36, 15 GeV, 20 bunches, last 2.5 hours, Background and scraping studies
por: Middelkoop, Willem Cornelis, et al.
Publicado: (1971) -
"ISR Running-In, Run 85: 9.7.1971, Ring 2, 22 GeV/c, 20 bunches, Vertical scraper scan of a stack"
por: Hübner, K, et al.
Publicado: (1971) -
Scraper Target Tests - Ring 1, Run 23: 15th February 1971
por: Montague, Brian William St. Leger
Publicado: (1971)