Cargando…
Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130291 |
_version_ | 1780915009368358912 |
---|---|
author | Gamble, J Kantardjian, G Lewis, D |
author_facet | Gamble, J Kantardjian, G Lewis, D |
author_sort | Gamble, J |
collection | CERN |
id | cern-1130291 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1978 |
record_format | invenio |
spelling | cern-11302912023-04-17T12:00:10Zhttp://cds.cern.ch/record/1130291engGamble, JKantardjian, GLewis, DRun 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISRAccelerators and Storage Ringsoai:cds.cern.ch:11302911978-09-26 |
spellingShingle | Accelerators and Storage Rings Gamble, J Kantardjian, G Lewis, D Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title | Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title_full | Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title_fullStr | Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title_full_unstemmed | Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title_short | Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR |
title_sort | run 974, 26 gev, lbac, r1 + r2, solenoid at 1.4 tesla: checking the programme to switch off the i1 solenoid and maintain circulating beams in the isr |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1130291 |
work_keys_str_mv | AT gamblej run97426gevlbacr1r2solenoidat14teslacheckingtheprogrammetoswitchoffthei1solenoidandmaintaincirculatingbeamsintheisr AT kantardjiang run97426gevlbacr1r2solenoidat14teslacheckingtheprogrammetoswitchoffthei1solenoidandmaintaincirculatingbeamsintheisr AT lewisd run97426gevlbacr1r2solenoidat14teslacheckingtheprogrammetoswitchoffthei1solenoidandmaintaincirculatingbeamsintheisr |