Cargando…
End of Run 45, beginning of Run 50: Comparative lifetime observations of 4-bunch and 20-bunch stacks of about 1A. Working point CLEO 1.5/0 in Ring 1
Autor principal: | Schnell, Wolfgang |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130318 |
Ejemplares similares
-
Run 99, 20 bunches, 22 GeV, Ring 2. Parasitic experiments on Q-shift in stack
por: Schnell, Wolfgang
Publicado: (1971) -
Run 30, 26.2.1971, 15 GeV. Ring 1, Last 1 1/2 hours: stacking at bottom with 20 bunches
por: Schnell, Wolfgang
Publicado: (1971) -
Microwaves from distorted stacks, Run 158, 20 bunches, 22 GeV/c, Ring 1 + Ring 2, Run 159, 20 bunches, 22 GeV/c, Ring 1 + Ring 2
por: Bramham, P, et al.
Publicado: (1972) -
"ISR Running-In, Run 68: 20 bunches, 26 GeV/c, Stacking at bottom in R1, at top in R2"
por: Schnell, Wolfgang
Publicado: (1971) -
Run 45, 20 bunches, 22 geV: Q-jump in PS
por: Schnell, Wolfgang
Publicado: (1971)